A circular route to low carbon cement
Reclinker tackles the two biggest sources of cement emissions at once: the calcination of limestone and the fossil fuel heat of the kiln.
Recover
Cement paste is recovered from end of life concrete, reducing the need for virgin raw materials.
Reactivate
Inside an electric arc furnace that is already recycling steel, the paste becomes new clinker.
Supply
A low carbon cementitious material ready for concrete producers, at cost parity.
Built on infrastructure that already exists
Low carbon
Reclinker says its process cuts emissions by more than 50% compared with traditional cement.
Competitive
Cost parity with conventional cement, so there is no green premium to justify.
Scalable
The process integrates into existing electric arc furnaces worldwide to produce cement at scale.
Proven
Multiple industrial scale trials at 7 Steel UK in Cardiff, with first commercial sales secured.
Request a trial batch
Three short steps. Your enquiry goes to the right person at Reclinker.
About you
What do you need?
Your details
Thanks, your enquiry is in
Preview only: nothing was sent. In the live build this lands in your CRM, alerts the right person and starts a follow up email.
What we checked on Reclinker's current site
Only issues we checked ourselves on 27 October 2026. Each item was checked on the live site.
Questions producers ask
What is Reclinker?
Reclinker, formerly Cambridge Electric Cement, turns demolition waste into low carbon cement. It is a University of Cambridge spin out based in Cardiff.
How does the process work?
Cement paste recovered from demolished concrete is reactivated into clinker inside the electric arc furnaces already used to recycle steel, producing new cement and recycled steel at the same time.
How much lower are the emissions?
Reclinker says its process cuts emissions by more than 50% compared with traditional cement, with further reductions as the technology scales.
Does it cost more than conventional cement?
No. Reclinker says it achieves cost parity with conventional cement, so sustainability does not come at a premium.
Where is it made?
At 7 Steel UK in Cardiff, where Reclinker has run multiple industrial scale trials and made its first commercial sales.
How do I request a trial batch?
Use the enquiry flow on this page. Tell us your role, volume and what you need, and the right person at Reclinker follows up.
The three lower bands, or the large side.
You are moving from trials to commercial production. This licence turns the website into the place producers request trial batches, then keeps improving that flow every month.
Web, SEO, AEO
Lower band£4,500 a month
Typical UK 2026: a web team, a B2B SEO shop, and an AEO retainer are three invoices. This is one. Then you raise it in the dashboard.
- Web team: live site built past this demo, hosting, speed, edits. No one to manage
- B2B SEO: one new search page and four content pieces in the base
- AEO / GEO: schema, FAQ, llms.txt, 90 day plan, AI-citation report
- This demo is the concept. Paying gets the better site plus those three, on one invoice
- Need more? Raise web, SEO or GEO in the dashboard. It adds to the next invoice
Web, SEO, AEO
Large side£9,500 a month
The large side of the same three retainers. Still one invoice. Still no one to manage.
- Web team at the large end: more pages, priority edits, quarterly redesign in the base
- B2B SEO at the large end: two search pages and eight content pieces a month
- AEO / GEO at the large end: GEO boost in the base, llms-full, monthly AI Overview tracking
- Same live site past this demo. Same dashboard. More of all three.
- Setup is one month (£9,500). Or 12 months now at 15% off (£96,900) plus setup
Site, edits, hosting
Typical UK hours retainer is £900 to £4,800 a month, and they still own the CMS. The live site, past this demo, is in the base.
Pages and compounding search
Typical UK B2B SEO is £1,500 to £5,000 a month. Serious SaaS shops are £3,000 to £10,000. Search pages and content are in the base.
Answers and AI citations
Typical UK AI-search start is about £2,500 a month. Mid-market to enterprise starts about £4,500. Schema, FAQ, llms.txt and the citation report are in the base.
Every page of Reclinker, rebuilt
Product and technology
4 pages from Reclinker's site, restyled.
Solutions
3 pages from Reclinker's site, restyled.
Company
12 pages from Reclinker's site, restyled.
Careers
1 pages from Reclinker's site, restyled.
News and press
6 pages from Reclinker's site, restyled.
Contact
1 pages from Reclinker's site, restyled.
Investors and traction
Mission, backers and milestones, quoted from Reclinker.


